Jon Versluis and I led one of the houses across the street from Brian's group. We worked mostly inside our house.
These boys removed and replaced some tile flooring.
We also had a group of girls doing lots of mudding and drywall repairs.
Levi, Ariel and Gina worked on repairing a hole in the kitchen drywall.
We also replaced some ceiling panels.
Then we got hungry.
We also did some outside work:
And we celebrated when the M:stl ban arrived with more supplies for us!
It was a good day at the sites, but there is SO MUCH more to do tomorrow.
No comments:
Post a Comment